Of all the projects The Fluid Group are involved with, just over half are for plant already in operation. We are often asked how existing processes may be optimised cost-effectively, particularly if they are performing below design expectation.
Optimisation and trouble shooting are the greatest challenges. Often, the simplest issues are flow-split modification, solids separation or poor mixing (a lack of scaleability from pilot plant to full scale is a typical scenario).
Where/how to add chemical, where to put baffles, how to improve clarification or reduce forces or heat in an existing plant are typical issues to resolve.
With 3D flow modelling at The Fluid Group, we can test new production options without affecting the on-line process.